2007

 

 

date: Project Description Photos
4/1-8/1   been lazy on here
  • New studio office
  •  New studio monitors
  •  Some new Prego floors
  •  Got the hot tub moved and hooked up
  •  bbq cover area tent thingy bob
  •  two new large outdoor heaters
  •  Pergola tranquility is up with grass and fire/water fountain
  •  Gazebos done !!! thanks friends
  •  moved a couple 20ft bamboo plants (for the gazebos)
  • Built the trikes had one have issues..,
  • Put hydraulic cover holder onto hot tub
  •  Picked up a bunch of wood loaded it for recycle
  •  New Pool Pump, Opened da Pool!
  • Put in ground lights
  • put in outdoor speakers
  • hooked up outdoor sound system,
  • sealed our parking lot
  • shingled where a window was on the studio
 
3/24-26 Tequila Shack Paving
  • Time for the shack to have a paved parking spot.
  • Thanks  from help from jerry we removed over 40K lbs of dirt. scrapped the sod off about 2-3 inches 40ftx40ft
  • smoothed the ground
  • put in ground fabric.
  • Had a company lay the gravel and asphalt.
 
3/31 New Gazebo
  • started a new gazebo, we are going to move the old one over the hot tub for chunky dunking privacy.
 
3/19-20 Built Heaters
  • Installed a couple huge outdoor heaters
 
1/25-present studio office
  • Hung shelving
  • installed like 6- 5 foot power strips 3 are UPS powered
  • setting up computers and all the stuff that goes with it
  • built shelves for the studio
  • many trips to the dump
  • TONS of organizing
 
1/21-24 Studio Office
  • Moved safe
  • Trimmed door
  • Touch up Paint.
 
1/20 Studio Office
  • Installed 2 sets of lights
  • Installed all covers (electrical, network, heater)
 
1/19 Studio Office
  • Painted
  • Wired in office to electrical panel.
 
1/17-18 Studio Office
  • Sanded and primed the walls
 
 1/14 Attic
  • put in structural wall and removed joists for easily access on the stairs to the attic.
 
1/14 -1/16 Studio Office
  • Mudded (dry walling)

 

 
 1/13 Studio Office
  • Final Dry walling touchups.
  • Glued in corner joints (dry walling)
 
 1/9-12 Studio Office
  • Dry walled 3 walls and the ceiling
  • wired in lighting
 
1/8 Studio Office
  • Got ready to drywall squaring all ends and ceiling
 
1/6-7 Studio Office
  • Wired 10 Network lines
  • Wired AC Power
  • Wired UPS Power
  • Wired Heater
  • Wired 6 phone lines
  • organized all wires getting ready to drywall

 

 
1/1-2 Studio Office
  • Removed old 4ft door
  • Framed it
  • Put in AC unit
  • Walled it and papered it