Project

Photos

Job details

  To be updated soon I have to go threw my photos and put projects in associated with them  
1/06 Studio bathroom  
  • finished walling up bathroom
  • installed electrical
  • created storage above bathroom
  • installed lighting fixtures
  • put in mini water heater
  • installed flooring
  • installed toilet
  • installed sink and cabinet
  • installed towel racks and tp
  • installed handicap rail
  • becca did her fo-leather and painted
  • installed trim and door pam and becca painted those.

 

1/06 Feed lines to studio  
  • Ran water line from one end of the building to the other threw attic and connected to lines that plumbers left
1/06 Hung new locking rail holders  
  • installed locking rails in studio (prevents lights from scooting around via Gravity)
1/06  Kitchen cabinets  
  • Becca sanded and painted cabinets and cupboards with a special stain process looks great did doors only