| Project |
Photos |
Job details |
| |
To be updated soon I have to go threw my
photos and put projects in associated with them |
|
| 1/06 Studio bathroom |
|
- finished walling up bathroom
- installed electrical
- created storage above bathroom
- installed lighting fixtures
- put in mini water heater
- installed flooring
- installed toilet
- installed sink and cabinet
- installed towel racks and tp
- installed handicap rail
- becca did her fo-leather and painted
- installed trim and door pam and becca painted those.
|
| 1/06 Feed lines to studio |
|
- Ran water line from one end of the building to the other threw
attic and connected to lines that plumbers left
|
| 1/06 Hung new locking rail holders |
|
- installed locking rails in studio (prevents lights from scooting
around via Gravity)
|
| 1/06 Kitchen cabinets |
|
- Becca sanded and painted cabinets and cupboards with a special
stain process looks great did doors only
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|