Project

INFO

Job details

Tonsils removed / HOLIDAYS   Didn't get much done in January do to holidays, surgery and recovery.
     
New oven / Microwave
Date Started: 12/20/04
Date Finish  3/30/05
  • Had to re-do the electrical to the breaker box
  • actually ordered Item on eBay  new and as of 1/1/06 it is working great  took a while to install because I had tonsils removed
Tanning room
Date Finish  3/30/05
 
Plasma TV project
Date Finish  3/30/05
  • hung a plasma 43" in a corner thanks to a friend (mike) we got a great deal on the hanger.
Sewing room
Date Started: 3/18/05
Date Finish 12/1/05

Before

Hang speakers
Date Finish  3/30/05
had to wire speakers we actually purchased along time ago since the plasma is in it is best to do so now.
Media Cabinet
Date Finish  12/15/05
  • Emptied out old stuff
  • Painted
  • Installed new shelving
  • Reinstall equipment
New mail box
Date Started: 4/7/05
Date Finish  4/7/05
  New Old Any questions?

  Note: it is in a bucket because the city pulled it out of the ground when the put a side walk in the front of our property

Plumbing line 8/05
  • Installed a plumbing line from the rear of the party building to 6 feet under the driveway.  this was done by Jerry's business. (good friend)
Tortus House 8/05
  • Built a outside house for tortuses
Plumbing into studio 11/1/05
  • removed outside water faucets
  • connected old connection into studio
  • Drilled into concrete and put in exit linesthis was all done by Jerry's business too  (I don't mess with exit plumbing don't want clogging, lol)
Kitchen Cabinet 11/05
  • Jim Built a new cabinet where one once did not stand.
  • made from oak plywood and oak trim
  • put in garbage disposal and wired
Kitchen Counters 10/05
  • Removed old tile counters and particle board
  • installed new plywood counters
  • cut out holes for sink and stovetop
  • installed wonder board
  • installed black granite tiles
  • grouted
  • sealed  Jim helped with all of this
Artesian Water filter 10/05
  • installed a reverse osmosis artesian water filter
  • had to install backboard in basement above utility sink
  • connected to 10 gallon storage tank
  • connect waste line to drain into sink
  • it has like 5 filters and a UV light for killing germs
  • connected to Refrigerator  Water and Ice
  • connected to instant hot under sink
Kitchen sink 10/05
  • installed granite sink
  • had issues cutting holes (have them do it in the future)
  • installed new Garbage disposal (ultra quiet)
  • Installed instant hot
wired dog area 10/05
  • put a light above trampoline 40 foot pole
  • wired a few plug ins under dog area leading to tort area up front
Studio Bathroom walls 12/15/05
  • built bathroom walls and wired electrical
us building foundation 12/23/05
  • Hired Danny to spend many hours to pour foundation for the US building Shop to be built
  • about 20 yards of gravel and 150 80lb bags of concrete.
Asphalt 12/23/05
  • put in posts for a future fence around garbage area
  • Danny and I spread asphalt to fill in hole made from the plumbing job.
  • Spread it around the side of the house for storage
hanging backdrops 5/05
  • Installed a hanging backdrop system in studio
removed hot tub deck 8/05
  • took a bunch of people and moved hot tub off deck
  • flattened ground
  • move hot tub on ground
Installed grass and rocks 8/05
  • Becca spent days digging out area for grass I just had knee surgery
  • Pam and Becca installed flat rocks and cut out grass around them on both sides of the hot tub