| Project |
INFO |
Job details |
| Tonsils removed / HOLIDAYS |
|
Didn't get much done in January do to
holidays, surgery and recovery. |
| |
|
|
| New oven / Microwave |
| Date Started: |
12/20/04 |
| Date Finish |
3/30/05 |
|
- Had to re-do the electrical to the breaker box
- actually ordered Item on eBay new and as of 1/1/06 it is
working great took a while to install because I had tonsils
removed
|
| Tanning room |
|
|
| Plasma TV project |
|
- hung a plasma 43" in a corner thanks to a friend (mike) we got a
great deal on the hanger.
|
| Sewing room |
| Date Started: |
3/18/05 |
| Date Finish |
12/1/05 |
|
   
Before |
| Hang speakers |
|
had to wire speakers we actually purchased along time ago
since the plasma is in it is best to do so now. |
| Media Cabinet |
|
- Emptied out old stuff
- Painted
- Installed new shelving
- Reinstall equipment
|
| New mail box |
| Date Started: |
4/7/05 |
| Date Finish |
4/7/05 |
|
New
Old
Any questions? Note: it is in a bucket because the city pulled
it out of the ground when the put a side walk in the front of our
property |
| Plumbing line |
8/05 |
- Installed a plumbing line from the rear of the party building to
6 feet under the driveway. this was done by Jerry's business.
(good friend)
|
| Tortus House |
8/05 |
- Built a outside house for tortuses
|
| Plumbing into studio |
11/1/05 |
- removed outside water faucets
- connected old connection into studio
- Drilled into concrete and put in exit linesthis was all done by
Jerry's business too (I don't mess with exit plumbing don't
want clogging, lol)
|
| Kitchen Cabinet |
11/05 |
- Jim Built a new cabinet where one once did not stand.
- made from oak plywood and oak trim
- put in garbage disposal and wired
|
| Kitchen Counters |
10/05 |
- Removed old tile counters and particle board
- installed new plywood counters
- cut out holes for sink and stovetop
- installed wonder board
- installed black granite tiles
- grouted
- sealed Jim helped with all of this
|
| Artesian Water filter |
10/05 |
- installed a reverse osmosis artesian water filter
- had to install backboard in basement above utility sink
- connected to 10 gallon storage tank
- connect waste line to drain into sink
- it has like 5 filters and a UV light for killing germs
- connected to Refrigerator Water and Ice
- connected to instant hot under sink
|
| Kitchen sink |
10/05 |
- installed granite sink
- had issues cutting holes (have them do it in the future)
- installed new Garbage disposal (ultra quiet)
- Installed instant hot
|
| wired dog area |
10/05 |
- put a light above trampoline 40 foot pole
- wired a few plug ins under dog area leading to tort area up
front
|
| Studio Bathroom walls |
12/15/05 |
- built bathroom walls and wired electrical
|
| us building foundation |
12/23/05 |
- Hired Danny to spend many hours to pour foundation for the US
building Shop to be built
- about 20 yards of gravel and 150 80lb bags of concrete.
|
| Asphalt |
12/23/05 |
- put in posts for a future fence around garbage area
- Danny and I spread asphalt to fill in hole made from the
plumbing job.
- Spread it around the side of the house for storage
|
| hanging backdrops |
5/05 |
- Installed a hanging backdrop system in studio
|
| removed hot tub deck |
8/05 |
- took a bunch of people and moved hot tub off deck
- flattened ground
- move hot tub on ground
|
| Installed grass and rocks |
8/05 |
- Becca spent days digging out area for grass I just had knee
surgery
- Pam and Becca installed flat rocks and cut out grass around them
on both sides of the hot tub
|