| Project |
INFO |
Job details |
| MOVED IN |
8/12/03 |
|
| Carpet Cleaned |
8/19/03 |
|
| Made dog run |
| Date Started: |
8/31/03 |
| Date Finish |
9/5/03 |
|
- put a plastic lattice on our deck guiding the dogs to the dog Holding
area, this required building a frame for the lattice
- put in lattice gate on deck
- building a holding area to guild dogs from deck into dog area
- removed a section of wire fence into the dog area
-
  
|
| Put in workbench and drawers |
| Date Started: |
9/5/03 |
| Date Finish |
100% |
|
- put in the workbench and all the drawers
- unloaded tool boxes (so I can start other projects easier)
-
|
| Built Desks |
| Date Started: |
9/5/03 |
| Date Finish |
9/6/03 |
|
- built desks bought from office depot
|
| built dog house |
| Date Started: |
9/14/03 |
| Date Finish |
9/14/03 |
| Workers |
Me and Becca |
| Time |
2 hours |
|
|
| Dog security (had a problem with dogs
getting under fence) |
| Date Started: |
9/9/03 |
| Date Finish |
9/9/03 |
| Workers |
Me and Becca |
| Time |
6 hours |
|
|
| Tore down front yard fence (the city of Tualatin
is putting a side walk in front of the yard) |
| Date Started: |
9/5/03 |
| Date Finish |
9/6/03 |
|
|
| Build platform for hot tub |
| Date Started: |
9/1/03 |
| Date Finish |
9/1/03 |
| Workers |
Me and Becca |
|
- removed old basket ball hoop
- dug out base for each of the 9 cement foots
- laid base boards level
- laid top boards

|
| Replace broken windows in entertainment building |
| Date Started: |
9/7/03 |
| Date Finish |
9/7/03 |
| Workers |
Jim alone |
| time |
3-4 hours |
|
- Get windows cut
- remove all old windows
- putty in new windows (Jim did all this) I had issues with the putty
|
| Replaced door locks |
| Date Started: |
9/13/03 |
| Date Finish |
75% |
|
- Replaced door locks with security locks
 |
| put in shelves |
| Date Started: |
9/12/03 |
| Date Finish |
9/12/03 |
|
- put in wire shelving above workbench
|
| Built stairs to attic |
| Date Started: |
9/13/03 |
| Date Finish |
90% |
|
- cut out stairs from a 2x12
- placed stairs in the joists and mounted
- put stairs into place
- mounted staircase into cement floor
NEED TO
- put in support beam
- level at top of attic
|
| Laid Beams |
| Date Started: |
9/19/03 |
| Date Finish |
9/19/03 |
|
- put in 8 - 6"x24' beams
- making the support beams from 4 feet to 2
- had to trim the edges of each 24 foot board then we would angle them
into on corner then Becca would put all her weight in the middle and Jim
and Ash would lift the beam up then Becca would get off snapping the
beams into place...
- leveled the old beams by using a car jack and raising it to the
level height and screwing in place
|
| Laid plywood floor |
| Date Started: |
9/20/03 |
| Date Finish |
9/25/03 |
|
- laid plywood on the newly laid beams totaling about 800 square feet.
had to cut plywood to fit where need be
-
 
|
| Rewire studio |
| Date Started: |
9/26/03 |
| Date Finish |
1/31/04 |
| Workers |
Me, Jim |
| Hours: |
20 |
|
- tear down old wiring and replace with old wiring
- put new plugs in studio
- put new lights and outlets
|
| Wired Lights in attic |
| Date Started: |
9/27/03 |
| Date Finish |
9/27/03 |
|
- Wired in 2 florescent lights to the attic hooked them to shop light
switch with there own independent switch
|
| |
|
|
| Wired 30 AMP plug for RV |
| Date Started: |
9/27/03 |
| Date Finish |
9/27/03 |
| Est time |
3 hours |
|
- Put in a 30 amp circuit to trailer
- rewired the wiring to plug
 |
| Installed studio heater |
| Date Started: |
10/8/03 |
| Date Finish |
10/8/03 |
| Workers |
Me |
|
- put in 220 30 amp breaker 2 pole
- ran wire from breaker to heater
- installed 6000 watt heater
 |
| New Roof |
| Date Started: |
10/24/03 |
| Date Finish |
10/25/03 |
|
- Remove old (2 layers of old 3 tab roofing and 1 layer of cedar
shingles)
- nail in all the nails
- lay plywood
- put new roof on 40 yr premium architectural
- clean up
|
|
|
old roof NASTY
|
|
|
|
Old Roof
|
|
|
|
Old roof back side... a garden of sorts
|
|
|
|
roofers working on roof
|
|
|
|
roofers working on roof
|
|
|
|
|
roofers working on roof
|
|
|
|
roofers working on roof
|
|
|
|
new root front
|
|
|
|
new roof back
|
|
|
|
| Hang Grape Lights |
| Date Started: |
10/25/03 |
| Date Finish |
10/26/03 |
| workers |
me |
| time |
3 hours |
|
- Removed old x-mas lights (white)
- hung new grape lights
-

|
| Attic Fan |
| Date Started: |
10/25/03 |
| Date Finish |
10/26/03 |
|
- we drilled out where I wanted it
- Roofers cut it out and placed fan and roofed around it
- we wired it Photo above
|
| Wired internet cable to media cabinet |
| Date Started: |
10/28/03 |
| Date Finish |
10/28/03 |
|
- went under the floor to the media cabinet for the permanent internet
connection to the media cabinet and Becca's computer
|
| Replace toilet. |
| Date Started: |
11/26/03 |
| Date Finish |
11/26/03 |
|
- Removed old toilet and put in new one... fairly easy no
complications
- Put in a Pressure toilet (it fills a bladder inside the tank that
gives a powerful flush)
  |
| Replace and return the top of the new
toilet |
| Date Started: |
11/29/03 |
| Date Finish |
11/29/03 |
|
- The top component of the new toilet kept running after a few days of
use
- not sure the cause was, took back the old one replaced the new one.
put on a stage 1 household filter to strain any partials that may of
clogged components
|
| Insulation |
| Date Started: |
11/30/03 |
| Date Finish |
1/31/04 |
| Workers |
Me, Becca, Jim, Rick |
| Hours |
10 |
|
- Had to remove hundreds of nails and screws
- lay the insulation and staple it in
 
|
| Wired Florescent wiring |
| Date Started: |
11/30/03 |
| Date Finish |
11/30/03 |
| Workers |
me |
| Hours |
4 |
|
 |
| Sealed and painted basement bedroom |
| Date Started: |
9/27/03 |
| Date Finish |
9/31/03 |
|
- Removed old nasty carpet
- Removed wallpaper
- Painted cement sealer on cement walls and floor
- Primed walls
- Painted walls
|
|
|
bedroom area painted and sealed
|
|
|
|
bedroom area painted and sealed
|
|
|
|
living room area painted and sealed
|
|
|
|
living room areaa painted and sealed
|
|
|
|
living area done
|
|
|
|
|
living area done
|
|
|
|
bedroom area done
|
|
|
|
| Laid tile |
| Date Started: |
10/25/03 |
| Date Finish |
10/26/03 |
|
- laid vinyl tile squares white and black
|
| Wired in retro light |
| Date Started: |
10/27/03 |
| Date Finish |
10/27/03 |
|
- Wired in retro light in living area
|
| |
|
|
| |
|
|